Ok, pretty pissed off as i'd hoped to have the painting done this weekend. Not happened for various reasons. However, i did get a respirator. Finished sanding the body and neck down to 320 and stuck a false neck on the body.
Anyway, if i manage to get the finish done next weekend I will then have to leave it 4 weeks before doing flatting and buffing. However, when this four week period ends i'll be in a weeks rehearsal then off on a 3 week tour. So basically i won't be around to do this. Is it ok to leave it longer before doing the flatting and buffing? (It's nitro paint I'm using). It's gonna be about 8 weeks.
The pisser is i was hoping to have it ready for the tour, but i don't wanna rush it for the sake of it and i'm back out in Jan.